Posted on: 17th Jun 2023
Security Risk Management Assignment, SMU, Singapore The Singapore & Malaysia governments have agreed to build a High-Speed Railway (HSR) to facilitate travel between
University | Singapore Management University (SMU) |
- The Singapore & Malaysia governments have agreed to build a High-Speed Railway (HSR) to facilitate travel between the 2 countries
- In light of this, the Singapore government has approved plans for the New HSR Depot at Tuas.
- Train Depots are attractive targets for terror groups bent on striking transportation networks. In view of this, the Ministry of Home Affairs has formed a task force to ensure proper risk assessments are conducted and integrated security measures are emplaced. The government wants to ensure that adequate security measures are implemented and also past incidents that impacted its MRT Depots do not recur. The IS supporters and returned fighters to the region have made this an even more pressing problem
- Based on your acute knowledge of security conditions and expertise in security, you have been specially selected to advise the HSR project team on security measures that should be emplaced at the New HSR Depot.
- A schematic of the site layout plan for the New HSR Depot, measuring 1 km by 500m, is attached as Appendix 1 to this Annexe A. The site will have the following: –
a. A two-story admin block to manage the Depot’s day-to-day operations. This includes dealing with maintenance contractors and other service providers/suppliers.
b. 2 x workshops for the maintenance of the Trains and adequate parking bays.
c. A 3-story HSR Control Centre with computer systems to schedule maintenance and management train operations. - To kick off the study, the HSR project team has tasked the Architects to share what they have prepared for the proposed development. The Architects have informed they plan to implement the following:
• A 2.4m high clear chain-link fence with a 10 cm concrete base will be installed at the site’s perimeter to enclose the New Depot.
• Perimeter fence to be covered by security lighting.
• The Main Guard House to serve as Security Control Room. It will be situated next to the main access gate. The main access gate will have standard non-crash-rated vehicle drop arm barriers and be covered by CCTV cameras to record pedestrian and vehicle movements.
• All buildings will be provided with mechanical lock and key systems. Glass façade will be used, wherever possible, to allow natural light to brighten up areas and reduce the need for artificial lighting.
• The train parking area will extend within 10 meters of the perimeter fence to optimize space for planning purposes.
• Deploy security manpower: 2 unarmed guards during the day – 0700hrs to 1900 hrs.; and 1 unarmed guard at night – 1900hrs to 0700hrs.
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Get Help By Expert
Looking for reliable support to excel in your Security Risk Management assignment at Singapore Management University (SMU)? Look no further than MY Assignment Help SG! Our Do My Assignment service offers specialized assistance tailored to your specific needs. From analyzing emerging threats to developing robust risk management strategies, our expert writers will ensure your assignment stands out. Join countless satisfied students who have achieved academic success with our online assignment help.
Answer
Recent Solved Questions
- Final Assignment: Migrating FashionOnline’s Infrastructure to AWS: A Strategy for Enhanced Availability and Data Protection
- HRM331: Talent Management – Strategic Shift from the War for Talent to the Wealth of Talent
- Marginalised Populations – The Structural and Cultural Exclusion of People Experiencing Homelessness in Singapore
- CVEN3501 Assignment 2: Groundwater Modelling of Drawdown from a Pumping Bore
- CSCI312 Assignment 2: Conceptual Modelling and Implementation of a Data Warehouse and Hive Queries
- CH2123 Assignment: Fugacity, VLE Modeling & Applications of Henry’s Law
- BAFI1045 Assignment -Constructing and Evaluating Passive and Active Portfolios Based on the Straits Times Index (STI)
- FIN2210E/FIN2212E Group Assignment: Financial Risk Management Analysis of Bursa Malaysia Companies
- FLM101 Assignment: A Film Analysis: Stylistic Techniques and Their Thematic Importance
- HRM Assignment Answer: Talent Transformation in the Age of AI: Turning Challenges into Opportunities via Ecosystem Innovation
UP TO 15 % DISCOUNT