University | Singapore University of Social Science (SUSS) |
Subject | HFSY217 Emergency Preparedness and Response Planning Assignment |
HFSY217 Emergency Preparedness and Response Planning Assignment, SUSS, Singapore: Facility 1, Emergency Authority: SCDF Banyan Fire Station (SCDF/BYFS)
Question 1
Based on the industrial visit, carry out an individual academic study into your observations and assessment of the facilities’ emergency preparedness and response planning. You are expected to examine the emergency plans, evacuation procedures, incident response procedures, and management strategies of the facilities (unlimited to the scope of this course) and illustrate in your TMA-Report how the respective facility plays their part in the overall preparedness of the Jurong Island Industry Community as follows:
(a) Facility 1, Emergency Authority: SCDF Banyan Fire Station (SCDF/BYFS).
Established in 2010, BYFS has a staff strength of 80 trained emergency response personnel operating in 3 rota (shift-system). Headed by the Station Commander, BYFS is equipped with emergency appliances such as Fire Engines, Red Rhinos, Fire Bikes, Combined Platform Ladder, Foam Tender, Foam Pods, HazMat Pods, HazMat Decon Pods, Hazmat Support Vehicle, Clothing Pods, Pod Carriers, Large Monitor Vehicles, Large Pumps, and Hose Laying Truck. Being faced with the potential threat scenario of a full surface tank fire, BYFS is also equipped with special equipment such as the 2000 GPM (gallon-per-minute) monitor. Together with Jurong Island Fire Station (JIFS), the SCDF covers all oil refineries, petrochemical industries, and chemical plants on the Jurong Island Industry
Stuck with a lot of homework assignments and feeling stressed ? Take professional academic assistance & Get 100% Plagiarism free papers
(b) Facility 2, Private Industry: Jurong Port Universal Terminal (JPUT).
JPUT is one of the largest independent petroleum storage terminals in Asia Pacific located amid the expanding Jurong Island Industrial Estate (JIIE). The site offers excellent accessibility by water and by land transport with 78 storage tanks and 15 berths, capable of handling 2 fully laden Very Large Crude Carrier (VLCC) simultaneously. For quality, security, and safety
control, the facility is well equipped with central monitoring of all tanks and systems with 24/7 integrated supervisory control and data acquisition (SCADA) system and closed-circuit television (CCTV) system to monitor tan level, pressure, and other parameters.
During the visit, you need to analyze and establish an understanding of the company’s nature of business, associated hazard scenarios, tier-level classification, and level of competency of the company emergency response team (CERT) with respect to the SCDF’s National CERT Standard requirements, company’s incident management structure, occupants’ evacuation and CERT incident response procedures, readiness outreach programs, and mutual aid participation, if any.
Buy Custom Answer of This Assessment & Raise Your Grades
Unlock your academic potential with our comprehensive support services in Singapore! At Assignment Help SG, we offer expert assistance for your University assignments and individual assignments, including the challenging HFSY217 Emergency Preparedness and Response Planning Assignment at the Singapore University of Social Science (SUSS). We go beyond assignments and also provide top-notch Dissertation Writing Services. Let us help you excel in your courses. Don't hesitate – invest in your future success today.
- A2329C Dosage Form Design AY2024 Term 4 – Graded Assignment (Individual Report), Singapore
- ANL312 Text Mining and Applied Project Formulation, End-of-Course Assessment, SUSS, Singapore
- CMM315 Peacebuilding and Security, End-of-Course Assessment, SUSS, Singapore
- HFS351 ECA (End-of-Course Assessment) SUSS : July Semester 2024 – Safety Management and Audit
- HFSY217 ECA (End-of-Course Assessment) SUSS : July Semester 2024 – Emergency Preparedness and Response Planning, Singapore
- NSG3EPN Assignment Two instructions rubric – Contemporary nursing practice :Engagement in Professional Nursing, LTU Singapore
- HFS201 GBA (Group-based Assignment) SUSS: July 2024 – Workplace Evaluation and Design
- Business Accounting & Finance – (VM) – A3 Assignment, UOM, Singapore
- HRM3010S: Managing People At Work, Assignment, UCD, Singapore
- HFS351: Safety Management and Audit, End-of-Course Assessment, SUSS, Singapore
UP TO 15 % DISCOUNT