University | Singapore University of Social Science (SUSS) |
Subject | FMT309: Building Diagnostics |
Posted on: 4th Sep 2023
FMT309: Building Diagnostics Assignment, SUSS, Singapore Appraise 5 considerations/performances in the selection of façade designs/ materials
Question 1: Building Envelope
- Appraise 5 considerations/performances in the selection of façade designs/ materials.
- Building facades require regular maintenance to prevent them from deteriorating and turning into a safety hazard. However, inspection and diagnostic of the building façade are increasingly challenging with the increasing complexity of the façade systems.
List 3 common defects for 5 of the following façade wall systems and discuss the possible causes that lead to the defects of the selected façade system:
(i) Precast concrete/concrete/brick wall
(ii) Plastered wall
(iii) Painted wall
(iv) Tiled wall
(v) Metal/stone cladding
(vi) Curtainwall - You are a Competent Person engaged to conduct the façade inspection for a commercial building with a glass curtain wall system. Formulate a proposal that outlines the procedures of your façade inspection for your client.
Question 2: Structural Investigation, Failure mechanisms, and diagnostic tools.
- Buildings require regular maintenance to continue to remain structurally safe for the intended users and occupants. It is required by law – under the Building Control Act – for building owners to engage a qualified Professional Engineer to conduct Periodic Structural Inspections once every ten years for residential buildings and once every five years for others. Elaborate on the stages of periodic structural inspection and explain the scope of each stage in detail.
- In the submission of the Inspection Report to BCA, a checklist is required to be included in and as part of the inspection report. Discuss the items on the Checklist for Periodic Structural Inspection of Existing Building.
- Discuss 5 types of common defects found in concrete buildings and their causes.
- Propose the suitable NDT tests for investigating each type of concrete defect listed in Question 2(c).
Question 3: The 3Ms – Maintenance, Management, and Mitigation
- The recent management and maintenance of the building are improved and enhanced with the availability of advanced information systems and innovative technologies. Discuss how you can adopt advanced information systems and innovative technologies in improving the management and maintenance of the building.
- Elaborate on the challenges in adopting digital technologies in building management and maintenance.
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Get Help By Expert
Looking for help with your FMT309 Building Diagnostics assignment at SUSS? Turn to My Assignment Help SG, the trusted name in Online Assignment Assistance. Our expert team ensures your academic success with top-notch solutions and timely delivery. Opt for our Do My Assignment service today and excel in your studies!
Answer
Recent Solved Questions
- A2329C Dosage Form Design AY2024 Term 4 – Graded Assignment (Individual Report), Singapore
- ANL312 Text Mining and Applied Project Formulation, End-of-Course Assessment, SUSS, Singapore
- CMM315 Peacebuilding and Security, End-of-Course Assessment, SUSS, Singapore
- HFS351 ECA (End-of-Course Assessment) SUSS : July Semester 2024 – Safety Management and Audit
- HFSY217 ECA (End-of-Course Assessment) SUSS : July Semester 2024 – Emergency Preparedness and Response Planning, Singapore
- NSG3EPN Assignment Two instructions rubric – Contemporary nursing practice :Engagement in Professional Nursing, LTU Singapore
- HFS201 GBA (Group-based Assignment) SUSS: July 2024 – Workplace Evaluation and Design
- Business Accounting & Finance – (VM) – A3 Assignment, UOM, Singapore
- HRM3010S: Managing People At Work, Assignment, UCD, Singapore
- HFS351: Safety Management and Audit, End-of-Course Assessment, SUSS, Singapore
UP TO 15 % DISCOUNT