University | Singapore University of Social Science (SUSS) |
Subject | FMT302- Operation and Maintenance of Building Services |
FMT302: Operation and Maintenance of Building Services Case Study, SUSS, Singapore The case study is a mixed development which is a 30-story commercial development comprising
Question 1
The case study is a mixed development which is a 30-story commercial development comprising an office block and a four-story retail podium with two basement levels located in downtown Singapore. This mixed development is accessible by road and MRT station. The retail podium is almost fully occupied and is a prime shopping and dining destination for locals, the working crowd in the surrounding office developments, and tourists.
The office block is of Grade-A office space and is leased to several multinational corporations and local companies.
The ACMV system had been served by two water-cooled centrifugal chillers. Facility Management had installed Building energy systems which are somewhat outdated. The building has an energy management system (EMS) that is not connected to all building energy systems and is not being used in a fully functional way. The monthly energy billings for tenants are in agreed proportion in the tenancy agreements. From the utility/energy billing data, it appears that the building has a peak cooling load in May and October.
Nearly 5 years ago, this building underwent a minor renovation. This renovation included installing a Direct Digital Control (DDC) energy management control system t control the variable air volume (VAV) ACMV system and lighting and a variable speed drive (VSD) for the chilled water system. The building was not commissioned as part of the renovation.
This commercial building had 16 lifts installed dating back to the building that was built in the 2000s. No lift modernization program was involved in the major changes except the replacement of lift hoisting ropes and hoisting motors.
An O&M assessment was performed after the renovation since the building energy bills seemed higher than expected. As a result of the assessment, a few O&M-related problems including system and equipment operation deficiency were identified. It was also determined that most of these problems had been present since the renovation.
The commercial building is managed by an in-house team for daily system operation and periodic/scheduled maintenance work. Specialized services like lift maintenance, fire alarm system, and BMS are performed by vendors and service providers.
You are the Building Manager of this mixed development. You have observed the existing physical system operation and conditions for quite a while. Study the case and apply for the course materials that you had learned from units 1 to 6 of this course,
Buy Custom Answer of This Assessment & Raise Your Grades
(a) Appraise the energy management system in the commercial building operation and examine the challenges of effective implementation of the energy monitoring and measures to achieve the required energy saving. Your analysis should include but not be limited to the following:
- Identify the equipment/system for energy improvement, the potential for energy saving, reduction of energy cost, etc
- Examine and identify techniques used for energy improvement to monitor the
energy consumption and propose the approach of energy conservation
techniques.
Propose and formulate approaches to monitor and meter the energy usage and consumption pattern.
(b) Good preventive maintenance practices are important to prolong the equipment’s life span and the sustainability of building operation. A holistic approach does not only include a conditions assessment that looks at maintenance issues and practices but also includes a thorough operations assessment.
- Examine how well the building control strategies, sequences of equipment
operations, Mechanical & Electrical equipment performance efficiency
trending and lighting control will improve building system operation and
equipment performance. - Being a building energy professional, propose smart analytic
techniques you would recommend analyzing in the building.
Stuck with a lot of homework assignments and feeling stressed ? Take professional academic assistance & Get 100% Plagiarism free papers
Navigating the challenges of FMT302: Operation and Maintenance of Building Services at Singapore University of Social Science (SUSS)? We're here to empower your success. Whether it's FY (Foundation Year) assignments or individual tasks, our services cater to your academic needs. Facing complexities in the case study of a mixed development? Leverage our Online Exam Help and assignment writing service. Our experts are here to ensure your mastery of the subject. Empower your academic path by paying our experts to guide you through the intricacies of your course. Let us be your partner in achieving excellence at SUSS. Your triumph is our priority!
- A2329C Dosage Form Design AY2024 Term 4 – Graded Assignment (Individual Report), Singapore
- ANL312 Text Mining and Applied Project Formulation, End-of-Course Assessment, SUSS, Singapore
- CMM315 Peacebuilding and Security, End-of-Course Assessment, SUSS, Singapore
- HFS351 ECA (End-of-Course Assessment) SUSS : July Semester 2024 – Safety Management and Audit
- HFSY217 ECA (End-of-Course Assessment) SUSS : July Semester 2024 – Emergency Preparedness and Response Planning, Singapore
- NSG3EPN Assignment Two instructions rubric – Contemporary nursing practice :Engagement in Professional Nursing, LTU Singapore
- HFS201 GBA (Group-based Assignment) SUSS: July 2024 – Workplace Evaluation and Design
- Business Accounting & Finance – (VM) – A3 Assignment, UOM, Singapore
- HRM3010S: Managing People At Work, Assignment, UCD, Singapore
- HFS351: Safety Management and Audit, End-of-Course Assessment, SUSS, Singapore
UP TO 15 % DISCOUNT