SST101 Principles of Project Management Assignment, SUSS, Singapore XYZ has been tasked to develop an online EV charging lots booking system pilot for Singapore
University | Singapore University of Social Science (SUSS) |
Subject | SST101: Principles of Project Management |
3. Demonstrate the differences between Resource Smoothing and Resource Levelling. Apply a relevant example of each technique to support your answer. (15 marks)
4. Identify if the critical path is impacted by Resource Smoothing or Resource Levelling. Explain your answer.
Project Team XYZ has been tasked to develop an online EV charging lots booking system pilot for Singapore. As part of this pilot, XYZ will need to provide the booking system for all the different EV charging retails.
The booking system will allow booking of EV charging lots for private car park lots as well as dedicated EV charging lots for 88 petrol kiosks. The system will need to be available via a website, as well as on both the Android and iOS app stores for app downloads. XYZ is given 36 weeks to complete the project.
At the present moment, it is the 18th week, and XYZ is running into a major resource constraint issue. In order to complete the project on time, XYZ will need eight full-time software engineers with specific expertise with the booking algorithm. However, two engineers have just tendered their resignation, thereby causing a big issue for the company.
- AVET104 Fundamentals of Biology Assignment: The Story of Signals, Energy & Expression Inside the Cell
- Workplace Health & Safety Review: Risk Assessments 1 and Accident Data Analysis
- Sensible Risk Assessment 2 Report: Personal Reflection on Workplace Report and Future Growth
- ACLP M1P TAE Written Assignment: Applying Skills Framework, Assessment Planning & Instructional Design for Learner-Centric Education
- EGH222 Employee Sick Days Prediction Assignment: Regression Model Using Demographic and Lifestyle Data
- Sustainability Presentation Assignment: Strategic Issues & Behavioural Campaign for Selected Company
- A2389C Pharmaceutical Supply Disruption Assignment: US Tariff Impact Case Study for Singapore’s Emergency Preparedness Plan
- 7WBS2012 Career Exploration in the Education Sector Assignment: A Post-MBA Pathway into Nursing Leadership
- CVE2322 Recyclable Gantry Design Assignment Project: Sustainable Civil Engineering Model Challenge
- BMG706 Strategic Quality Change Assignment Report: Enhancing Operational & Quality Management at any Organization
UP TO 15 % DISCOUNT