University | Nanyang Technological University (NTU) |
Subject | CV6213: Construction Technology |
CV6213 NTU: Construction Technology Report Singapore
Group Project Assignment
Select a completed/current tall building or bridge project for study/evaluation:
I. Review the various aspects of the construction technology previously / currently adopted, not limiting to the following:
1) Choice of structural material and the system
2) Method of construction (permanent and temporary works)
3) Construction plant/equipment planning
4) Various authorities’ requirements and approvals with respect to project planning, design, and construction requirements
E.g. the authorities; URA /BCA /MOM /PUB /NEA /LTA /SCDF /NParks /CAAS 5) Any others
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
II. Suggest improvement of the construction method in the areas of productivity/ quality/safety/time /cost /sustainability enhancement for SMART construction;
a) DFMA – (PPVC-Prefabricated Prefinished Volumetric Construction)
b) IDD SMART technology adoption – BIM/VDC, AR/VR, robotic, drone, AI, IoT, mobile collaboration, 3D printing, RFID, 3D scanning, etc
c) Advanced construction material
d) SG green plan – reduce carbon emission, circular economy
III. Identify the current practical issues faced by civil/structural design engineers in adopting BIM (3D) and quantity surveyor /project manager/ builder when implementing BIM (4D/5D).
IV. Suggest solution(s) to smoothen the application of BIM (3D, 4D, 5D) and adoption of AI to perfect the BIM implementation.
Buy Custom Answer of This Assessment & Raise Your Grades
- 6KNIS607 : Leading Change In Practice | Essay Writing
- SM9701 Strategic Innovation And Corporate Entrepreneurship At Wilmar International | Individual essay ,Singapore
- Novena Hospital Endoscopy Department Case Study | Assignment, Singapore
- HS8916 (Individual) Analysis Of The Health SG Strategy Using The Health Belief Model Assignment,Singapore
- Analysis Report On The Materials And Manufacturing Process Of Drone | Research Paper
- HS8291 (Individual Assignment) Adaptation In Clients Post Hematopoietic Stem Cell Transplantation | Essay Writing
- CM2005 Develop A Technical Analysis Toolkit For Visualising And Predicting Weather Data Using A Command Line Interface.
- Individual Report On Emerging Market Analysis for Investment
- The Supply Chain And Logistics Management Challenges Report Example
- MDP020N256 Perspectives in Consciousness |11Dec 2024,Singapore
UP TO 15 % DISCOUNT