University | Singapore Polytechnic School of Business (SP) |
Subject | Manage WSH in Construction Industry |
Manage WSH in Construction Industry Assignment, SP, Singapore The project involved the construction of a 12m high x 24m long iconic junction gateway arch, with the two legs
The project involved the construction of a 12m high x 24m long iconic junction gateway arch, with the two legs of the arch separated and diagonally placed on a pile cap between the corner of the Joo Chiat Road and Geylang Serai Junction, deemed sustainable green infrastructure to enhance pedestrian conn activity, anchor the Geylang Serai cultural belt, and maximize public open space to improve community health and urban wellbeing.
The three legs of steel parts for the arch structure were brought in by an extended trailer with the law enforcement Police guide transport from a woodland factory to the site, and had to be assembled on-site, raised slowly with a crane, and built separately and supported by the concrete pile cap below. If their dimensions differ by 0.396875 mm, they cannot be joined at the top. Welders must work very carefully to ensure accurate measurements, and builders are confident in their products with a margin of error of less than 0.5mm.
Buy Custom Answer of This Assessment & Raise Your Grades
Unlock the secrets of effective workplace safety and health management in the construction industry with our reliable online assignment writing service. Our expert writers at My Assignment Help SG provide comprehensive solutions tailored to Singapore Polytechnic School of Business (SP) requirements. Gain valuable insights and score top grades with our unique, well-researched assignments. Besides, this you also hire our experts for top Dissertation Writing Services.
- A2329C Dosage Form Design AY2024 Term 4 – Graded Assignment (Individual Report), Singapore
- ANL312 Text Mining and Applied Project Formulation, End-of-Course Assessment, SUSS, Singapore
- CMM315 Peacebuilding and Security, End-of-Course Assessment, SUSS, Singapore
- HFS351 ECA (End-of-Course Assessment) SUSS : July Semester 2024 – Safety Management and Audit
- HFSY217 ECA (End-of-Course Assessment) SUSS : July Semester 2024 – Emergency Preparedness and Response Planning, Singapore
- NSG3EPN Assignment Two instructions rubric – Contemporary nursing practice :Engagement in Professional Nursing, LTU Singapore
- HFS201 GBA (Group-based Assignment) SUSS: July 2024 – Workplace Evaluation and Design
- Business Accounting & Finance – (VM) – A3 Assignment, UOM, Singapore
- HRM3010S: Managing People At Work, Assignment, UCD, Singapore
- HFS351: Safety Management and Audit, End-of-Course Assessment, SUSS, Singapore
UP TO 15 % DISCOUNT