BPM309: Cost Management for M&E Works Assignment, SUSS, Singapore An M&E Engineer prepares the tender drawings (Figure Q1.1) for a hose reel and dry riser system
Question 1
An M&E Engineer prepares the tender drawings (Figure Q1.1) for a hose reel and dry riser system. Briefly describe the scope of works of the fire protection system to be installed and illustrate the associated measurement rules and principles.
Question 2
Interpret Figures Q2.1, Q2.2, and Q2.3 in the Appendix and apply suitable measurement techniques to work out the bills of quantities to install electrical works for the transformer room and switch room.
Question 3
The Facilities Manager of a shopping center is planning to upgrade the existing CCTV system to an IP type of system. Therefore, the Facilities Manager has assigned the task to the engineer to prepare the documents to invite three contractors to submit quotations for the upgrading works. Prepare the itemized cost breakdown for the CCTV upgrading work and illustrate the associated measurement rules and principles.
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Buy Custom Answer of This Assessment & Raise Your Grades
At Myassignmenthelp.sg, we believe that academic assistance should be accessible to everyone. That’s why we offer our services at the most competitive rates. Our mission is to help students achieve their academic goals and excel in their studies without breaking the bank. So, if you need help with report writing, don’t hesitate to reach out to us. Our professional assignment helpers are ready to provide you with superb academic support that will exceed your expectations. Contact us today and experience the difference!
- A2329C Dosage Form Design AY2024 Term 4 – Graded Assignment (Individual Report), Singapore
- ANL312 Text Mining and Applied Project Formulation, End-of-Course Assessment, SUSS, Singapore
- CMM315 Peacebuilding and Security, End-of-Course Assessment, SUSS, Singapore
- HFS351 ECA (End-of-Course Assessment) SUSS : July Semester 2024 – Safety Management and Audit
- HFSY217 ECA (End-of-Course Assessment) SUSS : July Semester 2024 – Emergency Preparedness and Response Planning, Singapore
- NSG3EPN Assignment Two instructions rubric – Contemporary nursing practice :Engagement in Professional Nursing, LTU Singapore
- HFS201 GBA (Group-based Assignment) SUSS: July 2024 – Workplace Evaluation and Design
- Business Accounting & Finance – (VM) – A3 Assignment, UOM, Singapore
- HRM3010S: Managing People At Work, Assignment, UCD, Singapore
- HFS351: Safety Management and Audit, End-of-Course Assessment, SUSS, Singapore
UP TO 15 % DISCOUNT